International Journal of Production Research · 1989 · 161 citations · 9 references
EngineeringIndustrial EngineeringOperations ManagementProduction EngineeringProduction SystemsSchedulingJust-in-time ProductionProduction Planning SystemsProduction SchedulingSchedule OptimizationScheduling TheoryJust-in-time SchedulingJust-in-time SystemsMixed-model ProductionMixed-model Production PlanningMixed-model Production SchedulingMulti-level SystemsSmall Lot Production
Abstract Many companies are converting their mixed-model multi-level production systems to just-in-time systems. This requires reducing set-up times so that small-lot production can be run. In this paper a theoretical basis is developed for scheduling these systems, and scheduling algorithms and heuristics are developed. The only other known scheduling method (the goal-chasing method), developed and used by Toyota, is shown to be a special case of these heuristics.
9
Production-Line Balances for Mixed-Model Lines
J. L. C. Macaskill · Management Science · 1972 · 136 citations
Engineering, Industrial Engineering, Operations Management +13