2013 · 130 citations · 14 references
ComputingComputer ScienceComputer SystemsDocumentationOperating SystemsQuality AssurancePatch AnalysisPatch ManagementPatch QualityPeer ReviewSoftware MaintenanceVersion ControlCase Study EvaluationEnd-user ExperienceKernel PatchingPatch Adoption AnalysisPatch DistributionPatch Quality AnalysisPatch ReviewReviews
The Linux kernel follows an extremely distributed reviewing and integration process supported by 130 developer mailing lists and a hierarchy of dozens of Git repositories for version control. Since not every patch can make it and of those that do, some patches require a lot more reviewing and integration effort than others, developers, reviewers and integrators need support for estimating which patches are worthwhile to spend effort on and which ones do not stand a chance. This paper crosslinks and analyzes eight years of patch reviews from the kernel mailing lists and committed patches from the Git repository to understand which patches are accepted and how long it takes those patches to get to the end user. We found that 33% of the patches makes it into a Linux release, and that most of them need 3 to 6 months for this. Furthermore, that patches developed by more experienced developers are more easily accepted and faster reviewed and integrated. Additionally, reviewing time is impacted by submission time, the number of affected subsystems by the patch and the number of requested reviewers.
14
A case study of open source software development
Audris Mockus, Roy T. Fielding, James D. Herbsleb · 2000 · 540 citations · Full text
The promises and perils of mining git
Christian Bird, Peter C. Rigby, Earl T. Barr et al. · 2009 · 310 citations · Full text
Characterizing and predicting which bugs get fixed
Philip J. Guo, Thomas Zimmermann, Nachiappan Nagappan et al. · 2010 · 267 citations
Open source software peer review practices
Peter C. Rigby, Daniel M. Germán, Margaret‐Anne Storey · 2008 · 235 citations