IEEE Transactions on Semiconductor Manufacturing · 1989 · 32 citations · 2 references
EngineeringManufacturing EngineeringQuality ManagementInventory ControlInventory ManagementManufacturing SystemsJust-in-time DeliveryJust-in-time Material DeliveryJust-in-time ProductionProduction SchedulingPull Production SystemsSetup Time ReductionCycle Time OptimizationDemand Pull SchedulingJust-in-time InventoryJust-in-time Inventory ControlJust-in-time ManufacturingJust-in-time SystemsManufacturing Cycle TimeProduct Quality Improvement
The successful application of the just-in-time (JIT) manufacturing management philosophy within a wafer fab photoresist wet chemistry area is described. The JIT techniques that were applied included lot-size reduction, setup-time reduction, layout changes for improved work flow, and improved operator flexibility. These set the stage for the implementation of a demand-pull system that resulted in significant decreases in cycle times as well as corresponding decrease in inventory levels. Aspects related to quality improvement as well as other long-term issues are also discussed.< <ETX xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">></ETX>
2