International Journal of Production Research · 2003 · 36 citations · 32 references
EngineeringIndustrial EngineeringManufacturing EngineeringComputer-aided DesignManufacturing ProcessesProduction PlanningComputer-aided ManufacturingComputer-aided Process PlanningMachiningManufacturing Process PlanningAutomated Process PlanningAutomatic Process PlanningComputer-aided Design PlanningComputer-aided Manufacturing PlanningDatumsMachining Process PlanningManufacturing Sequence PlanningPrecedence Constraint Modeling
Abstract Automatic set-up planning has been regarded as a challenging task in computer-aided process planning (CAPP), which is a critical link in the integration of computer-aided design (CAD) and computer-aided manufacturing (CAM). Solving this problem is a top priority for CAD/CAM researchers and developers. Many researchers have worked on the problem and proposed different solutions based on geometry analysis, precedence constraint analysis, kinematic analysis, force analysis and tolerance analysis. However, these solutions generally use an ad hoc approach rather than a systematic approach. Consequently, the solutions can sometimes be impractical. An integrated methodology is presented to generate set-ups and select set-up datums and to determine set-up sequence. The methodology can deal successfully with a variety of components, thus providing a practical solution to the set-up planning problem that is crucial to the metal cutting industry. Acknowledgement The paper was based on work supported by the National Science Foundation under Grant No. 0099735. Any opinions, findings and conclusions or recommendations expressed here are those of the authors and do not necessarily reflect the views of the National Science Foundation.
32
Computer Integrated Manufacturing Systems
Elsevier Sdol · 2009 · 931 citations
Engineering, Manufacturing Engineering, Systems Engineering +12
Evolution and Future Perspectives of CAPP
Hoda ElMaraghy · CIRP Annals · 1993 · 257 citations