Water Resources Research · 1974 · 28 citations · 17 references
Natural ResourcesHydrologyWater Resources ManagementWater Resource ManagementWater Resources EngineeringWater Resources PlanningReservoir ManagementUrban Water SystemsWater EconomicsWater ManagementWater Resource EconomicsWater Resource Management DecisionsObjective Function FormulationOperating Policy OptimizationOperating Policy SearchOptimal PoliciesStochastic Dynamic Programming
A method for finding optimal operating policies for a multiunit water resource system that extends over two river basins and serves multiple demands is presented. The method was developed and tested for one of several systems that have been proposed for further development of the water resource in the urbanizing Piedmont Triad region of North Carolina. Monthly operating decisions are given by solutions of a piecewise linear programing problem, the objective function for which consists of two parts, immediate economic losses within the month and the expected present value of future losses as a function of end‐of‐month storage levels in the reservoirs. The latter function is estimated by imbedding the linear programing problem in a stochastic dynamic programing problem. An approximate solution technique for the larger problem is described, and computational experience is reported.
17
Linear Programming and Sequential Decisions
Alan S. Manne · Management Science · 1960 · 435 citations
Finding Reservoir Operating Rules
G. K. Young · Journal of the Hydraulics Division · 1967 · 254 citations
Natural Resources, Hydrology, Natural Resource Economics +15