Concepedia

Publication | Closed Access

The Linear Decision Rule in Reservoir Management and Design: 1, Development of the Stochastic Model

302

Citations

7

References

1969

Year

Abstract

With the aid of a linear decision rule, reservoir management and design problems often can be formulated as easily solved linear programing problems. The linear decision rule specifies the release during any period of reservoir operation as the difference between the storage at the beginning of the period and a decision parameter for the period. The decision parameters for the entire study horizon are determined by solving the linear programing problem. Problems may be formulated in either the deterministic or the stochastic environment.

References

YearCitations

Page 1