Space Science Reviews · 2007 · 13 citations · 2 references
EngineeringAerospace EngineeringAstronomyAstrophysicsPlanetary ScienceSpacecraft DesignCommand HandlingData HandlingMission PlanningMission RequirementsSatellite InstrumentationSpace ExplorationCommand Of SpacecraftMission ArchitectureMission Data HandlingMission Operations PlanningSpace Mission OperationsSpacecraft Command ArchitectureSpacecraft Data Handling ArchitectureUplink Management
ESA’s Rosetta mission was launched in March 2004 and is on its way to comet 67P/Churyumov-Gerasimenko, where it is scheduled to arrive in summer 2014. It comprises a payload of 12 scientific instruments and a Lander. All instruments are provided by Principal Investigators, which are responsible for their operations. As for most ESA science missions, the ground segment of the mission consists of a Mission Operations Centre (MOC) and a Science Operations Centre (SOC). While the MOC is responsible for all spacecraft-related aspects and the final uplink of all command timelines to the spacecraft, the scientific operations of the instruments and the collection of the data and ingestion into the Planetary Science Archive are coordinated by the SOC. This paper focuses on the tasks of the SOC and in particular on the methodology and constraints to convert the scientific goals of the Rosetta mission to operational timelines.
2
The Rosetta Mission: Flying Towards the Origin of the Solar System
Karl‐Heinz Glaßmeier, H. Boehnhardt, D. Koschny et al. · Space Science Reviews · 2007 · 582 citations
Natural Sciences, Astronomy, Physics +14
Venus Express science planning
D. V. Titov, H. Svedhem, D. Koschny et al. · Planetary and Space Science · 2006 · 168 citations