2009 · 29 citations · 31 references
EngineeringElectrical EngineeringSystems EngineeringOptimizationRenewable Energy SystemsSchedulingInfrastructure RestorationInteger ProgrammingPower Grid AnalysisPower OptimizationPower SystemsUtility RestorationBlack-start ProceduresElectricity Service RestorationGrid Restoration PlanningMixed-integer ProgrammingOperatorsPower Generation SchedulingPower System OptimizationRestoration Scheduling
In an earlier EPRI project, the authors employed a knowledge-based system (KBS) to develop a tool to guide system operators to restart generators after a blackout. In this paper, the authors convert the KBS formulation into a Mixed Integer Quadratically Constrained Program (MIQCP) problem. Taking advantage of the quasiconcave property of the generation ramping curves, an algorithm to solve the generator start-up sequence problem is proposed. The solution method breaks the restoration horizon into intervals and develops the restoration plan by finding the status of each generator at each time interval. Optimality is achieved at each step. The algorithm was tested using the PECO data from the EPRI project.
31
Power System Restoration - A Task Force Report
M. M. Adibi, P. Clelland, L.H. Fink et al. · IEEE Transactions on Power Systems · 1987 · 237 citations
Engineering, Electrical Engineering, Systems Engineering +15