SPE Production & Facilities · 2004 · 24 citations · 4 references
EngineeringPetroleum EngineeringWater TreatmentWell IntegrityWell TestingHole CleaningWellbore CleaningWellbore FlowWellbore HydraulicsNear-wellbore Damage RemovalPlug RemovalWellbore Clean-upWellbore CleanupWellbore Plugging
Summary This paper presents the results of a wide-ranging investigation into the application of high-power sound waves to remove plugging material from the wellbore and near-wellbore regions. This paper describes the process of generating high-power sound waves with a high-voltage electrical discharge and summarizes the results of the laboratory and test-well trials conducted on both simulated plugging materials and mudcake. The paper also references the development progress of a prototype wireline-conveyed, wellbore-cleaning system. The results of the investigation concluded that high-power sound waves represent a viable wellbore-cleaning technology with the potential to be applied effectively in removing various forms of wellbore-plugging material. Because this process can be applied selectively and in a controlled manner in the wellbore, without environmental impact and with standard wireline-deployment techniques, it offers considerable benefits vs. some existing solutions.
4
Enhancement of Liquid Flow Through a Porous Medium by Ultrasonic Radiation
A.C.T. Aarts, G. Ooms, K.J. Bil et al. · All Days · 1998 · 15 citations