Production Planning & Control · 2010 · 11 citations · 10 references
EngineeringManufacturing EngineeringComputer-integrated ManufacturingManufacturing ProcessesManufacturing SystemsManufacturing SimulationThroughput AnalysisCycle TimeFactory SimulationFlow Line RepresentationManufacturing Process SimulationProduction Line Queueing ModelsShop Floor SimulationSimulation Of Manufacturing Systems
Litho cells, are the most expensive equipment in a wafer fab. To support decision-making on this equipment, accurate simulation models for throughput and cycle time are helpful. The simulation models that are typically developed incorporate various shopfloor details. To properly model these details, they should be quantified, which is difficult and time-consuming.In this paper, a lumped parameter model is proposed for the litho cell. The model consists of two parts: a detailed representation of the processing inside the track and scanner, and an aggregate representation of the factory floor feeding the loadport.The track-scanner is modeled as a tandem flow line with blocking. The shop floor is represented by a delay distribution that incorporates all contributions outside the machine. Simulation results show that the suggested method provides a simple, yetaccurate approximation of the litho cell.
10
Syntax and consistent equation semantics of hybrid Chi
D.A. van Beek, Ka Lok Man, Michel Reniers et al. · The Journal of Logic and Algebraic Programming · 2005 · 147 citations · Full text