Development of the Alba Field – Evolution of Completion Practices, Part 2 Open Hole Completions; Successful Outcome – Drilling with SBM and Gravel Packing with Water Based Carrier Fluid

Grant Murray, K. Morton, S. Blattel, N.M. Macmillan, J. Roberts

2002 · 14 citations · 2 references

Concepts

Abstract

Abstract Chevron has been successfully drilling and gravel packing open hole horizontal wells on the Alba Field (central North Sea) since 1998 and 13 open-hole gravel packed (OHGP) wells drilled with water based mud(WBM) are currently in production with no history of sand production. Although these wells have been hugely successful with significant net present value (NPV) returns it was recognised that the future, mature redrill and infill targets cannot sustain the current costs associated with traditional OHGP completions. The challenge was to develop alternative techniques to maintain the benefits of OHGP wells but to achieve a low cost well and completion concept to assist in realising new drilling opportunities. To drill the shale above the top of the reservoir and the productive interval in a single hole section would remove the conventional requirements to set an additional casing string and change over to a water based system prior to drilling into the reservoir. This would save costs but raise a question over the gravel packing operation. Hitherto, attempts to gravel pack involving á/â placement techniques using an aqueous carrier fluid following drilling with oil based systems have had only limited success. The prospective problems were examined by extensive laboratory tests carried out by Baroid and Chevron in co-operation. A new synthetic oil based mud (SBM) formulation was developed and compatible displacement fluids and procedures were devised. Based on this work, 1500 ft of shale and reservoir were drilled; a liner was installed – predrilled over the reservoir section - and screen was run inside the liner. Gravel was pumped using brine as carrier fluid and complete gravel placement was achieved. The well has achieved productivity levels at least as good as existing WBM wells. A second well completed in the same manner has given similar performance. This combination of a liner system and SBM fluids offers several advantages. There is the prospect of considerable savings with respect to operating time, cementing and drilling fluids. Also the liner gives protection to the screen. This new approach which represents potential large savings in costs and excellent productivity is considered to be very applicable for expandable sand screens (ESS), multi-lateral completions and additional redrill targets both on Alba and worldwide.

References

2