Concepedia

Abstract

A beamline for high resolution powder diffraction studies will be installed as one of the first operational beamlines at the Australian Synchrotron and will be located on a bending magnet source. The beamline will be cable of using energies of 4–30 keV and comprise two end stations. The optical and end station design and performance specifications are presented.