NASA STI Repository (National Aeronautics and Space Administration) · 2000 · 121 citations · 0 references
Open access
EngineeringAerospace EngineeringProject PlanningSpacecraft DesignSurveyingMission DevelopmentMission PlanningMission RequirementsProject Cost ManagementProject ObjectivesSpace ExplorationDevelopment Cost AllocationDevelopment Cost EstimationLaunch Vehicle DesignMission Planning SystemsPlanetary Mission DesignPlanetary Mission PlanningPublic Funding ConstraintsSpace Mission Design
NASA's Mars Surveyor Program (MSP) began in 1994 with plans to send spacecraft to Mars every 26 months. Mars Global Surveyor (MGS), a global mapping mission, was launched in 1996 and is currently orbiting Mars. Mars Surveyor '98 consisted of Mars Climate Orbiter (MCO) and Mars Polar Lander (MPL). Lockheed Martin Astronautics (LMA) was the prime contractor for Mars Surveyor '98. The Jet Propulsion Laboratory (JPL), California Institute of Technology, manages the Mars Surveyor Program for NASA's Office of Space Science. MPL was developed under very tight funding constraints. The combined development cost of MPL and MCO, including the cost of the two launch vehicles, was approximately the same as the development cost of the Mars Pathfinder mission, including the cost of its single launch vehicle. The MPL project accepted the challenge to develop effective implementation methodologies consistent with programmatic requirements.