Journal of the Geotechnical Engineering Division · 1974 · 127 citations · 0 references
EngineeringCivil EngineeringSoil SciencesFoundation EngineeringGeotechnical EngineeringSoil MechanicsClay MineralsExpansive SoilsFoundation ConstructionGeotechnical DesignSoil CompactionSoil StabilizationClay Soil StabilizationDifferential HeaveExpansive Soil FoundationsExpansive Soil StabilizationFoundationFoundation On Expansive SoilsHeaveMoisture Content
Expansive clay soils, especially montmorillonite, cause significant structural damage worldwide, costing billions annually in the U.S., with heave driven by climate, moisture, soil type, and load. The study aims to evaluate the relative cost of alternative design strategies for mitigating expansive soil risks. Designing for expansive clay involves site characterization, followed by corrective measures such as chemical stabilization, presaturation, compaction, or engineered foundations like piers, grade‑beams, and reinforced slabs.
Numerous man-made structures around the world have been subjected to considerable damage due to differential heave from moisture absorbed by expansive clay foundation soils. It has been estimated that the annual cost of damage from expansive soils in the United States alone is $2.3 billion. The actual heave is a function of many factors, e.g., climatic conditions, moisture content of the soil immediately prior to placement of the structure, the amount and type of foundation soils, and the overburden load at the foundation level. Of the three most prominent clay minerals—illite, kaolinite, montmorillonite—the latter constitutes the most expansive type of clay soil. The current design practice for construction in expansive clay subsoil starts with a study of the site to determine the soil's characteristics. The appropriate correction action may include stabilization by chemical means, presaturation, compaction, and the design of engineered-type foundations, such as pier and grade-beam, and reinforced slabs. The relative cost of alternative designs should be evaluated in terms of the risks involved.