Proppant Placement Efficiency
Proppant Placement Efficiency is a quantitative metric in hydraulic fracturing engineering that measures the ratio of the volume of proppant effectively positioned within the target fracture zone to the total volume of proppant injected, thereby indicating the effectiveness of proppant transport and deposition in achieving optimal fracture conductivity.
57
Publications
1.7K
Citations
199
Authors
54
Institutions
Publications per year
2017–2026
17
Parents
57
Alireza Keshavarz, Alexander Badalyan, Raymond L. Johnson et al. · Journal of Natural Gas Science and Engineering · 2016 · 85 citations
Engineering, Geological Engineering, Petroleum Engineering +17
1–5 of 57
199
5
h-index
3
h-index
3
h-index
3
h-index
3
h-index
1–5 of 199
54
Halliburton (United Kingdom)
Arbroath, United Kingdom
8 h-index
21 publications
374 citations
The University of Texas at Austin
Austin, United States
5 h-index
11 publications
262 citations
Schlumberger (British Virgin Islands)
Road Town, British Virgin Islands
5 h-index
16 publications
613 citations
Devon Energy (United States)
Oklahoma City, United States
5 h-index
10 publications
500 citations

The University of Adelaide
Adelaide, Australia
4 h-index
15 publications
1.1K citations
UCL Australia
Adelaide, Australia
4 h-index
15 publications
1.1K citations
Mitchell Institute
Portland, United States
2 h-index
7 publications
177 citations
Universidade Católica de Santos
Santos, Brazil
2 h-index
2 publications
83 citations
1–8 of 54
Conference · 10 publications · 313 citations
10
h-index
Conference · 4 publications · 113 citations
4
h-index
Conference · 4 publications · 130 citations
4
h-index
3 publications · 97 citations
3
h-index
Conference · 3 publications · 47 citations
3
h-index
1–5