Gate Release Scheduling

Gate Release Scheduling is a hydrological control strategy that systematically regulates the timing and volume of water discharges through reservoir gates to optimize flood mitigation, downstream safety, and water resource management.

4

Publications

153

Citations

11

Authors

7

Institutions

Publications per year

2017–2026

2

Authors

11

  1. TK
    Toshio Koike

    The University of Tokyo, Japan

    1 publications · 44 citations

    1

    h-index

  2. KY
    Kun Yang

    Chinese Academy of Sciences, China

    1 publications · 44 citations

    1

    h-index

  3. GG
    Gautam Gupta

    Ames Research Center, United States

    1 publications · 67 citations

    1

    h-index

  4. HA
    Hasan Albo-Salih

    Arizona State University, United States

    1 publications · 29 citations

    1

    h-index

  5. OS
    Oliver Saavedra

    Tokyo Institute of Technology, Japan

    1 publications · 44 citations

    1

    h-index

1–5 of 11

Venues

  1. Journal of Hydrologic Engineering

    1 publications · 44 citations

    1

    h-index

  2. Water

    1 publications · 29 citations

    1

    h-index

  3. AIAA Guidance, Navigation, and Control Conference

    Conference · 1 publications · 67 citations

    1

    h-index

1–3