Backfill Grouting
Backfill Grouting is a civil engineering technique in tunneling that involves injecting a stabilizing grout material into the annular gap between the tunnel boring machine's shield and the tunnel lining to ensure ground stability, prevent surface settlement, and transfer loads effectively.
38
Publications
1.5K
Citations
147
Authors
49
Institutions
Publications per year
2017–2026
29
38
Shimin Wang, Chuan He, Liang Nie et al. · Tunnelling and Underground Space Technology · 2019 · 89 citations
1–5 of 38
147
5
h-index
4
h-index
3
h-index
3
h-index
3
h-index
1–5 of 147
49
Tongji University
Shanghai, China
7 h-index
21 publications
921 citations
Chang'an University
Xi'an, China
5 h-index
29 publications
1.2K citations

Southwest Jiaotong University
Chengdu, China
3 h-index
10 publications
604 citations

Central South University
Changsha, China
3 h-index
13 publications
833 citations
Beijing Jiaotong University
Beijing, China
3 h-index
6 publications
443 citations
Liaoning Technical University
Fuxin, China
2 h-index
11 publications
511 citations

Sahand University of Technology
Tabriz, Iran
2 h-index
4 publications
92 citations

Southeast University
Nanjing, China
2 h-index
6 publications
401 citations
1–8 of 49
8 publications · 396 citations
7
h-index
6 publications · 292 citations
6
h-index
2 publications · 96 citations
2
h-index
Repository · 2 publications · 56 citations
2
h-index
EJECE · 2 publications · 50 citations
2
h-index
1–5