Concepedia
Statistics
Publications
11
Citations
433
H-Index
10
Active since
2014
Affiliations
Xi'an Jiaotong University(Current)
Xi'an University of Architecture and Technology
Southeast University
Fuli Xiong is an author at Xi'an Jiaotong University specializing in industrial engineering, scheduling, and production planning.
Publications per year
2014–2025
Minimizing the total completion time in a distributed two stage assembly system with setup times
Fuli Xiong, Keyi Xing, Feng Wang et al. · Computers & Operations Research · 2014 · 67 citations
Engineering, Industrial Engineering, Operations Management +14
Just-in-time scheduling for a distributed concrete precast flow shop system
Fuli Xiong, Mengling Chu, Zhi Li et al. · Computers & Operations Research · 2021 · 65 citations
Management, Industrial Engineering, Distributed Systems +7
Meta-heuristics for the distributed two-stage assembly scheduling problem with bi-criteria of makespan and mean completion time
Fuli Xiong, Keyi Xing · International Journal of Production Research · 2014 · 59 citations
Management, Industrial Engineering, Manufacturing Engineering +17
Deadlock-free scheduling for flexible manufacturing systems using Petri nets and heuristic search
Hang Lei, Keyi Xing, Libin Han et al. · Computers & Industrial Engineering · 2014 · 56 citations
Engineering, Industrial Engineering, Manufacturing Engineering +15
Scheduling a hybrid assembly-differentiation flowshop to minimize total flow time
Fuli Xiong, Keyi Xing, Feng Wang · European Journal of Operational Research · 2014 · 43 citations
Management, Industrial Engineering, Operations Management +13
1–5 of 11