Publication | Closed Access
Efficient 3-D reliability analysis of the 530m high abutment slope at Jinping I Hydropower Station during construction
58
Citations
41
References
2015
Year
Geotechnical EngineeringReliability EngineeringEngineeringSlope StabilityHydropower StationHigh Abutment SlopeRock SlopeDam FoundationCivil EngineeringGeomechanicsConstruction ManagementStructural ReliabilityEmbankment DamEngineering GeologyConstruction EngineeringStructural Engineering
| Year | Citations | |
|---|---|---|
Page 1
Page 1