Implementing Building Information Modelling: a case study of the Barts and the London hospitals

Chris Harty, David Throssell, H. Joel Jeffrey, M Stagg

2010 · 10 citations · 4 references

Concepts

Abstract

The potential to be gained through better integration and coordination of design and construction information has long been understood within the construction sector (e.g. Higgin & Jessop, 1965). Currently, Building Information Modelling (BIM) technologies are being heralded as able to provide this increased integration, and the business case for their adoption in terms of saving rework and avoiding costly errors is highly persuasive. The benefits of a complete and accurate source of design and construction information are also being extended into the operation and maintenance of these facilities. However, the uptake of these technologies within the sector is partial and fragmented, and the projects which have made a commitment to project-wide implementation of BIM oriented ways of working are few and far between (one example is the new Terminal 5 at Heathrow: see Harty, 2005; 2008). Perhaps because of this, although BIM is increasing being discussed in both academic and practitioner oriented literature, there is little detailed description of the benefits and challenges of implementing BIM on large projects, especially from the point of view of the contractor. This paper begins to address this, by presenting a case study of a major contractor, Skanska, implementing BIM on two large hospital projects in the UK: the Barts and the London hospitals. We argue that BIM is a set of practices or activities, rather than just a set of technologies, and describes the new ways of working that emerged through the implementation process. We especially concentrate on ways BIM activities were developed to bridge gaps; between designer and contractor; between office and building site; between construction and O&M. It also describes how BIM moved from being a collaborative space for exploring design solutions, to a ‘roadmap’ for the construction process, or a central ‘index’ of design and construction information for the projects. Our central message is that although BIM technologies were selected primarily to aid spatial coordination, the range of new practices around BIM extends way beyond this. The project from which the empirical material in the paper is taken involves a combination of refurbishment and new build work across two London hospitals, with a total value of approximately £1 billion. The project involves the construction of two new ’state-of-the-art’ hospitals on separate but existing hospital sites in Central London covering a built area of 270,000 m2. In total the hospitals will hold over 1200 beds and employ 7000 staff (see also Huberman and Throssell, 2008). We describe several applications which have been developed on the project. These include using the BIM model as a tool to perform ‘virtual snagging’, as part of design reviews, health and safety checks, and discussions with eventual facility management of the hospital, progress checking and handovers using site based hand-held devices, modelling the installation and removal of large pieces of medical equipment and performing material take-offs. Implementing building information modelling: a case study of the Barts and the London hospitals

References

4