The Florida AI Research Society · 2009 · 51 citations · 7 references
ComputingComputer ScienceOptimizationProgramming LanguagesSchedulingResource-constrained SchedulingScheduling OptimizationScheduling TheoryFunction Modeling LanguageInterval SchedulingResource-aware SchedulingScheduling ConstraintsScheduling ProblemsScheduling Semantics
In version 2.0, IBM ILOG CP Optimizer has been extended by the introduction of scheduling support based on the concept of optional interval variables. This paper formally describes the new modeling language features available to the users of CP Optimizer for resource-based scheduling. We show that the new language is flexible enough to model problems never before addressed by CP scheduling engines, as well as naturally describing classical scheduling problems found in the literature. This modeling power is based on a small number of general concepts such as intervals, sequences and functions. This makes the modeling language simple, clear and easy to learn, while maintaining the highlevel structural aspects of the scheduling model.
7
Constraint-Based Attribute and Interval Planning
Jeremy Frank, Ari Jónsson · Constraints · 2003 · 205 citations
Generating robust schedules through temporal flexibility
Nicola Policella, Stephen F. Smith, Amedeo Cesta et al. · 2004 · 91 citations