The Engineering Economist · 2015 · 26 citations · 21 references
BusinessNatural Resource EconomicsPetroleum EngineeringResource ValuationStochastic ModelingUncertainty QuantificationMonte Carlo MethodsMonte Carlo SimulationProject ValuationReal Options AnalysisSimulation MethodsValuation ModelingExploration ValuationLeast-squares Monte CarloProbabilistic Valuation ModelsProject Delay ValuationReal Options PricingStochastic Commodity Price ModelsStochastic Price ModelingStochastic Valuation Models
The timing flexibility of investments in oil and gas assets can potentially add value. In this article, we examine the value of waiting in exploration projects and propose a real option–based valuation method using least-squares Monte Carlo simulation. We show that the dynamics of the oil and gas prices have a large impact on the value of the option to wait, especially for projects with long lead times and durations. The uncertainty in the forward price curve is modeled using a two-factor stochastic price process. The article also presents the valuation method in the form of MATLAB functions and routines that can be used as an efficient test and analysis platform using the industry-standard input formats.
21
Eduardo S. Schwartz, Avinash Dixit, Robert S. Pindyck · The Journal of Finance · 1994 · 9.9K citations
Avinash Dixit · The Journal of Economic Perspectives · 1992 · 995 citations · Full text