Orbit on demand - In this century if pushed

James A. Martin

Aerospace America · 1985 · 19 citations · 0 references

Concepts

Abstract

Performance requirements and design features of the next generation of manned launch vehicles are discussed. The vehicles will launch within minutes of demand and will have a several-day turnaround time. Launch and landing sites will have minimal facilities. Baseline requirements comprise carriage and return of a 5000 lb, 7 ft diam, 15 ft long payload, a 160 n. mi. polar orbit, a 200 fps on-orbit delt-V capability, provisions for two men for 24 hr, an 1100 n. mi. cross range option, 500 flights/vehicle, land on 10,000 ft runways, and be acceptable passing over populated areas. Significant advances are needed in propulsion and fuel systems, lightweight durable structures and airbreathing acceleration engines. Trade-offs have yet to be fully explored among the number of stages and horizontal or vertical take-off.