CONCRETE · 1983 · 10 citations · 0 references
EngineeringCivil EngineeringPavement EngineeringSoil MechanicsStructural EngineeringConcrete MaterialsPavement ConstructionPavement MaterialsPavement Performance AnalysisPavement Structural AnalysisStructural DesignConcrete Paving UnitsHeavy-duty PavementsLateral Load DistributionLateral Load ResponseLoad Transfer In SandsPavement Base ConstructionPavement Base DesignPavement Edge Restraints
The article discusses the results of a series of model tests using a specifically designed transparent rig which was able to simulate sub-base behaviour. A series of calibrated spring loaded plates were used to represent the upper sub-base - several of these plates were monitored for deflection to measure any load transferred. Tests were carried out to investigate the effect of changing joint width, jointing and bedding sand grading, bedding sand thickness, jointing sand height and the development of lateral load. It was found that a decrease in joint width increased performance; joints should not be less than 0.5 mm or exceed 5 mm and should be filled with sand for optimum efficiency. Zone 2 sand is a better bedding sand than the firmer zone 4 material. Edge restraints must be efficient and bedding sand thickness kept to the minimum practical limit. It is recommended that all granular sub-base areas should be laid in two 50 mm layers: the first layer rolled once and re-screeded with loose sand. Sharp dry zone 3 sand should be used for herringbone pattern and zone 4 for blocks in stretcher bond. Heavy duty pavements and areas subjected to channelised traffic should be rolled over once or twice with a heavy static road-roller. (TRRL)