BRIDGE DECK COVER DEPTH SPECIFICATIONS

Richard E. Weyers, Wioleta A. Pyc, Michael M Sprinkel, Trevor J. Kirkpatrick

ACI Concrete International · 2003 · 12 citations · 0 references

Concepts

Abstract

Concrete cover is the first line of defense in preventing the corrosion of reinforcing steel. This article presents the results of two bridge deck cover depth surveys in order to determine the most desirable method for specifying reinforcing steel cover depths. One method specifies a bridge deck cover depth of 2.5 in with tolerance limits of -0 and +0.5, and includes a supplemental pay item to the contractor for placing an additional 0.5 in of concrete. Both data sets in the two bridge deck cover depth surveys have the same cover depth limits of 2.5 to 3.0 in. One data set includes the supplemental pay item in the project specification, while the other set is for bridge decks built without the inclusion of the supplemental pay item. Statistics on cover depth and time for initiation of corrosion are given. The mean time for initiation of corrosion is 40-41 years for both data sets. However, 13% of the sample decks in the data set where the supplemental pay item was not included had an estimated time to corrosion initiation of less than 30 years. In comparison, none of the decks in the sample with the supplemental pay item had an estimated time of corrosion of less than 30 years. These results show that the supplemental pay item for an additional 0.5 in of concrete has prevented the construction of bridge decks with less than desirable cover depths and thus, shorter service lives.