Alexandria Engineering Journal · 2015 · 62 citations · 10 references
ArchitectureConstruction ManagementConstruction Project ManagementFacility LocationOptimizationCombinatorial OptimizationConstruction LayoutConstruction PlanningGenetic AlgorithmsLayout OptimizationSite LayoutConstruction Site Layout OptimizationConstruction Site Layout PlanningFacility Layout ProblemGenetic Algorithm Site Layout OptimizationSite Layout AnalysisSite Layout OptimizationTemporary Site FacilitiesTemporary Site Layout
Tower crane is increasingly becoming one of the key components of temporary site layout facilities in most construction projects. Determining the location of tower crane is an essential task of layout planning, which is also the central focus of this study. The optimization of tower crane location depends on many interrelated factors, including site constraints, shape and size of the buildings, type and quantity of required materials, crane configurations, crane type, and construction site layout. These factors vary from one project to another, resulting to complicated site layout strategies and approaches. This fact makes the crane location problem impractical to be solved depending on experience of practitioners only which was gained by assuming and through trial and error. This paper aimed at developing an optimization model to solve tower crane location problem in construction sites. The objective was to minimize the total transportation time. Genetic Algorithms (GA) optimization technique is utilized to solve the problem. A numerical example is presented to test and validate the results obtained by the model.
10
Location Optimization for a Group of Tower Cranes
P. Zhang, F Harris, Paul Olomolaiye et al. · Journal of Construction Engineering and Management · 1999 · 161 citations · Full text
Management, Industrial Engineering, Operations Management +17