Transportation Research Record Journal of the Transportation Research Board · 1992 · 13 citations · 0 references
EngineeringSystems EngineeringTransportation PlanningTransportTransportationTransportation EngineeringPriority QueuesPublic TransitTraffic OperationsTraffic Signal ControlTransit OperationsTransport OperationsDelay MinimizationPreemptionPrioritization MechanismsRail Transit OperationsTraffic Signal TimingTransit Priority SystemsTransit Signal PriorityUrban Rail Transit
The San Diego trolley, an electrified light rail transit system, has changed its method of controlling trolley movement at signalized intersections on arterials in downtown San Diego. The previous method required a trolley to preempt, or alter, the normal operation of the traffic signals for the trolley to have uninterrupted movement at traffic signals as it traveled between stations. The new method, dubbed the trolley priority system, instead provides favorable timing to the trolley as a part of the normal operation of the traffic signals. The trolley priority system has proven to be more reliable than the preemption system and requires less maintenance. One notable drawback is that the new system sometimes requires the trolley to wait longer in the station before departing than did the previous system. However, since implementation of the trolley priority system, studies have shown that overall trip time has improved in the downtown area. Although at times a train may encounter delay beyond the normal station dwell time, by awaiting the appropriate entrance window on the next traffic signal cycle, the actual operating time between stations is enhanced.