WIT transactions on the built environment · 2004 · 13 citations · 2 references
EngineeringElectrical EngineeringTransportTransportationTransportation EngineeringElectric PowertrainsLosses In Electric MachinesPublic TransitRail TransportEnergy Loss AnalysisLevelized Cost Of ElectricityOperational Cost AnalysisRailway Power SupplyRailway SimulationTractionTransport CapacityVoltage
When a new transit line is being built, apart form many other aspects, it is also necessary to study alternatives of the traction power supply system. One aspect to be studied in calculating the operational cost is the estimated level of electricity cost. If the line exceeds 22000 pphd (passenger per hour per direction), i.e., medium sized transport capacity, train-set configuration will consist of more than 4 vehicles, and headway time between the trains will get narrower, which results in greater traction energy demand. Energy loss in a conductor is doubling the voltage level reduces the energy losses to one quarter. This might not be correct because of regenerative energy.
2