Techno-economic assessment of a plant for the upgrading of MSW biogas to synthetic natural gas by thermocatalytic methanation

P. Sanz-Monreal, Pablo Aragüés-Aldea, P. Durán, Eva Francés, J. Herguido, J.Á. Peña

Biomass and Bioenergy · 2025 · 10 citations · 34 references

DOIFull text

Open access

Concepts

Abstract

This study evaluates the techno-economic feasibility of a plant designed to produce synthetic natural gas (SNG) from biogas through direct catalytic methanation . The proposed facility is simulated with Aspen Plus ® v14, using a comprehensive approach that covers the entire process, from biogas pretreatment to the production of the final product. The installation aims to contribute to the development of Power-to-Gas ( Power-to-Methane ) strategy for decarbonization. The plant, to be located in northeastern Spain, operates at an industrial scale with a production capacity of approximately 1100 Nm 3 /h of SNG, obtained from a 1425 Nm 3 /h biogas plant. The process includes five main stages to meet Spanish gas quality standards for grid injection: desulfurization , using amines for sulfur removal ; electrolysis, for the generation of renewable hydrogen ; thermocatalytic methanation , which combines CO 2 from the biogas with hydrogen to enrich the methane content; dehydration, to meet SNG moisture specifications; and cogeneration , intended for the joint production of electricity and steam to meet the plant's energy demands. A detailed analysis of investment costs (CAPEX) and operational expenses (OPEX) is conducted, identifying the key factors influencing the project's profitability. The economic assessment indicates a total capital investment of 21.83 M€ and operational expenses nearly 8 M€ annually. The profitability threshold for the base scenario is estimated at 91.75 €/MWh, exceeding the 2023 natural gas market average in the Iberic peninsula (39.11 €/MWh), highlighting the current economic challenges of SNG production .

References

34