Journal of Management in Engineering · 2022 · 21 citations · 60 references
ArchitectureConstruction ManagementProject ManagementConstruction ContractsConstruction EngineeringConstruction Project ManagementInfrastructure ConstructionProcurementProject Delivery MethodsCo-creation With StakeholdersFlood Mitigation StrategiesProject Performance EvaluationProject Review DocumentationPublic Construction ContractsPublic Construction Projects
The current economic and infrastructural growth in developing countries has triggered the use of multiple forms of alternative contracting methods (ACMs)—including engineering, procurement, and construction (EPC)—in various public sector projects. However, the relative lack of in-depth experience in using EPC contracting methods among public agencies has presented numerous problems. To this end, the goal of this research is to identify the broad postaward construction and contract management (PA-CCM) challenges associated with EPC projects in developing countries using two major infrastructure hydropower projects in Uganda as case studies. A systematic literature review was first conducted to establish a preliminary list of challenges. Afterward, case study data were collected by examining project documentation, conducting site visits, and holding semistructured interviews. The results of this study offered a total of 73 PA-CCM challenges that were categorized into seven different themes. Also, 14 critical lessons learned were identified to better enable stakeholders to mitigate potential problems and promote improved performance for their EPC projects. The outcomes of this paper serve as a pivotal foundation for construction practitioners and future scholars to develop effective mitigation strategies for the challenges associated with EPC contracting methods in developing countries.
60
Building Theories from Case Study Research
Kathleen M. Eisenhardt · Academy of Management Review · 1989 · 16.2K citations