A Case History: Completion and Stimulation of Horizontal Wells with Multiple Transverse Hydraulic Fractures in the Lost Hills Diatomite

M.A. Emanuele, W.A. Minner, L. Weijers, E.J. Broussard, D.M. Blevens, B.T. Taylor

1998 · 13 citations · 0 references

Concepts

Abstract

A Case History: Completion and Stimulation of Horizontal Wells with Multiple Transverse Hydraulic Fractures in the Lost Hills Diatomite M.A. Emanuele; M.A. Emanuele Chevron U.S.A. Production Company Search for other works by this author on: This Site Google Scholar W.A. Minner; W.A. Minner Pinnacle Technologies Search for other works by this author on: This Site Google Scholar L. Weijers; L. Weijers Pinnacle Technologies Search for other works by this author on: This Site Google Scholar E.J. Broussard; E.J. Broussard Chevron U.S.A. Production Company Search for other works by this author on: This Site Google Scholar D.M. Blevens; D.M. Blevens Chevron U.S.A. Production Company Search for other works by this author on: This Site Google Scholar B.T. Taylor B.T. Taylor Dowell Schlumberger Search for other works by this author on: This Site Google Scholar Paper presented at the SPE Rocky Mountain Regional/Low-Permeability Reservoirs Symposium, Denver, Colorado, April 1998. Paper Number: SPE-39941-MS https://doi.org/10.2118/39941-MS Published: April 05 1998 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Emanuele, M.A., Minner, W.A., Weijers, L., Broussard, E.J., Blevens, D.M., and B.T. Taylor. "A Case History: Completion and Stimulation of Horizontal Wells with Multiple Transverse Hydraulic Fractures in the Lost Hills Diatomite." Paper presented at the SPE Rocky Mountain Regional/Low-Permeability Reservoirs Symposium, Denver, Colorado, April 1998. doi: https://doi.org/10.2118/39941-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu toolbar search search input Search input auto suggest filter your search All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Rocky Mountain Petroleum Technology Conference / Low Permeability Reservoirs Symposium Search Advanced Search AbstractThe Lost Hills Field Diatomite has traditionally been developed using vertical wells completed with multiple propped hydraulic fracture treatment stages. As the main portion of the field is nearing full development at 2 1/2-acres per producer, the search for additional reserves has moved out to the flanks of the field's anticlinal structure. Due to limited pay thickness, these flank portions of the field will not support economic vertical well development. The use of horizontal wells was determined to have the best chance to economically develop these areas of the field. To evaluate this development concept, three horizontal wells were drilled and completed over the time period from November 1996 to December 1997To assist with the horizontal well design and evaluation, several vertical data wells were drilled offset and parallel to the intended well path of each horizontal well. Additionally, two vertical core wells were drilled in line with the toe and heel of the horizontal well paths. These data wells were utilized to estimate properties such as in-situ stress profiles, pore pressure gradients, rock properties and fluid saturations, and to determine horizontal well vertical depth placement. The horizontal wells were then drilled in the direction of minimum horizontal stress (transverse to the preferred hydraulic fracture orientation) and completed with multiple-staged propped hydraulic fracture treatments.During the completion of the three horizontal wells, hydraulic fracture growth behavior was characterized using surface tiltmeter fracture mapping and real-time fracture pressure analysis. In the third horizontal well, downhole tiltmeter fracture mapping was also used. This combination of fracture diagnostics provided significant insights into hydraulic fracture behavior, allowing diagnosis of anomalous fracture growth behavior and evaluation of remediation measures. Fracture diagnostics during the first horizontal well revealed an unexpectedly complex near-wellbore fracture geometry, a result of fracture initiation problems. These problems slowed the completion process and severely harmed the effectiveness of the fracture-to-wellbore connection. In the subsequent horizontal wells, a number of design and execution changes were made which resulted in simpler near-wellbore fracture geometry and a greatly improved production response.The paper provides an overview of the completion and stimulation of all three horizontal wells, describes the lessons learned along the way, and discusses the implications for future Lost Hills horizontal well development.P. 335 Keywords: wellbore, completion, injection, procedure, fracture mapping, net pressure, stimulation, weijer, height coverage, fracture Subjects: Hydraulic Fracturing This content is only available via PDF. 1998. Society of Petroleum Engineers You can access this article if you purchase or spend a download.