An Effective Horizontal Well Completion and Stimulation System

Rocky Seale, James Athans, Daniel Themig

Proceedings of Abu Dhabi International Petroleum Exhibition and Conference · 2006 · 10 citations · 0 references

Concepts

Abstract

Over the last two decades many developments have enabled accelerated growth in horizontal drilling. Drilling has led the way, with current technology capable of drilling thousands of feet laterally through a hydrocarbon reservoir. Second, has been completion and stimulation advancements. Initially horizontal drilling was limited to naturally fractured reservoirs with simple open hole or slotted liner completions. This was due primarily to the ability of the reservoir to flow economically without the need for stimulation. Reservoirs requiring stimulation were not candidates for horizontal drilling. Developments in completion and stimulation technology specific for horizontal drilling have broadened the application range for the technology.Until recently there have been two completion and stimulation option. The horizontal can be completed open hole, or with slotted or perforated liner. This has essentially negated any effective stimulation along the entire length of the horizontal wellbore. The second completion system requires cementing the production liner and running multiple isolation systems to effectively treat different sections of the wellbore. This requires multiple coiled tubing trips along with multiple rig up and rig down of the stimulation equipment involved. These multi-stage horizontal completions take weeks to complete at high cost and elevated risks. Ultimately, the high completion costs or the lack of production due to ineffective stimulation make many reservoirs uneconomical to exploit.This paper will detail a new completion system which is run as part of the production liner, which does not require cementing and provides positive mechanical diversion at specified intervals, so fracturing and stimulations can be pumped effectively to their targeted zone. Details of the engineering design and testing will be specified, with elaboration on the applications and case histories were these systems have been successfully deployed. The case histories will detail the operational efficiencies of the system in conjunction with the enhanced production realized.