Proceedings of SPE Annual Technical Conference and Exhibition · 2000 · 42 citations · 0 references
EngineeringPetroleum EngineeringSolid Waste ManagementWaste ManagementWater TreatmentFrac Pack CompletionHole CleaningCompletion Clean-up ProceduresFilter Cake ManagementGravel Pack CompletionsGravel PackingOpen Hole Completion ScreeningOpen Hole Gravel PackingOpen-hole CompletionOpenhole Gravel Pack
Filtercake Cleanup in Open-Hole Gravel-Packed Completions: A Necessity or A Myth? M.E. Brady; M.E. Brady Schlumberger Search for other works by this author on: This Site Google Scholar A.J. Bradbury; A.J. Bradbury M-I Search for other works by this author on: This Site Google Scholar G. Sehgal; G. Sehgal Schlumberger Search for other works by this author on: This Site Google Scholar F. Brand; F. Brand Schlumberger Search for other works by this author on: This Site Google Scholar S.A. Ali; S.A. Ali Chevron Search for other works by this author on: This Site Google Scholar C.L. Bennett; C.L. Bennett BP Search for other works by this author on: This Site Google Scholar J.M. Gilchrist; J.M. Gilchrist BP Search for other works by this author on: This Site Google Scholar J. Troncoso; J. Troncoso Repsol-YPF Search for other works by this author on: This Site Google Scholar C. Price-Smith; C. Price-Smith Schlumberger Search for other works by this author on: This Site Google Scholar W.E. Foxenberg; W.E. Foxenberg M-I Search for other works by this author on: This Site Google Scholar M. Parlar M. Parlar Schlumberger/M-I Search for other works by this author on: This Site Google Scholar Paper presented at the SPE Annual Technical Conference and Exhibition, Dallas, Texas, October 2000. Paper Number: SPE-63232-MS https://doi.org/10.2118/63232-MS Published: October 01 2000 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Brady, M.E., Bradbury, A.J., Sehgal, G., Brand, F., Ali, S.A., Bennett, C.L., Gilchrist, J.M., Troncoso, J., Price-Smith, C., Foxenberg, W.E., and M. Parlar. "Filtercake Cleanup in Open-Hole Gravel-Packed Completions: A Necessity or A Myth?." Paper presented at the SPE Annual Technical Conference and Exhibition, Dallas, Texas, October 2000. doi: https://doi.org/10.2118/63232-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Annual Technical Conference and Exhibition Search Advanced Search AbstractOffshore reservoirs requiring sand control pose a major completion challenge because of extremely high cost and risk involved in remedial treatments, particularly in sub-sea completion and/or deep-water environments. It is therefore of utmost importance to ensure sand control without sacrificing flow conformance, recoverable reserves and well deliverability throughout the expected life of the completion. A major trend in these environments is towards open-hole, horizontal, gravel-packed completions. Although gravel packing stabilizes the wellbore, it can also entrap the filter-cake formed by the reservoir drilling fluid, potentially resulting in high drawdown requirements (flow initiation pressures) and/or low production rates (retained permeabilities). The cleanup procedures in the industry have varied significantly from no cleanup at all to complicated two-stage breaker treatments involving post-completion coiled tubing intervention, with no guidelines existing in the literature.In this paper, we present experimental results and field cases involving filter-cake flow-back through gravel packs with and without cleanup. Effects of various parameters, including gravel size (40/60, 20/40, and 12/20), formation permeability, drill-solids type (clays, quartz) and concentration, and the type of cleanup fluid have been investigated. Flow initiation pressure and retained permeabilities during flow back are reported as a function of these parameters. The experimental results show that the flow initiation pressure is a strong function of gravel size and the type of drill solids. It is concluded that, in clean (low-to-no clay content) formations of large grains and high permeabilities (~ several darcies) requiring large gravel sizes (e.g., 12/20), an enzyme or an oxidizer treatment is sufficient based on laboratory results and productivity predictions. This conclusion is also supported by several field applications as shown. In lower permeability (~ 100–250 md) formations of small sand sizes requiring smaller gravel (e.g., 40/60) elimination of both the fluid loss control agent (starch) and bridging agent (CaCO3) is necessary based on high flow initiation pressures and low retained permeabilities. In intermediate permeability (~ 500–800 md) formations of medium size sand-grains typically requiring 20/40 gravel, the results depend strongly on the type of drill solids: in clean formations (no clays in drilling fluid), an enzyme or an oxidizer treatment is sufficient, while in dirty formations removal of both CaCO3 and starch is necessary. These results are also supported by field case histories presented in the paper.IntroductionGravel packing has been gaining wider popularity in open-hole horizontal completions where sand control is required, particularly in sub-sea completion and/or deep-water environment. The cost of intervention in such cases makes risk mitigation a much more pronounced task. Until recently, a large majority of horizontal sand control completions have utilized standalone screens. However, because a substantial fraction of these wells have failed prematurely (either productivity loss due to screen plugging or loss of sand control due to screen erosion),1 many operators have changed their primary completion technique in these wells from standalone screens to gravel packing. This is particularly true in formations containing a large fraction of non-pay (shale, mudstone/siltstone) and/or have a wide particle size distribution.2 Keywords: completion, drilling fluids and materials, flow initiation pressure, fip, spe 63232, cleanup, upstream oil & gas, gravel pack, drill solid, drilling fluid selection and formulation Subjects: Drilling Fluids and Materials, Drilling fluid selection and formulation (chemistry, properties) This content is only available via PDF. 2000. Society of Petroleum Engineers You can access this article if you purchase or spend a download.