Perforating Requirements for Sand Prevention

A. Venkitaraman, L. A. Behrmann, A. Noordermeer

2000 · 15 citations · 0 references

Concepts

Abstract

Perforating Requirements for Sand Prevention A. Venkitaraman; A. Venkitaraman Schlumberger Reservoir Completions Search for other works by this author on: This Site Google Scholar L.A. Behrmann; L.A. Behrmann Schlumberger Reservoir Completions Search for other works by this author on: This Site Google Scholar A.H. Noordermeer A.H. Noordermeer BP Amoco Exploration Search for other works by this author on: This Site Google Scholar Paper presented at the SPE International Symposium on Formation Damage Control, Lafayette, Louisiana, February 2000. Paper Number: SPE-58788-MS https://doi.org/10.2118/58788-MS Published: February 23 2000 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Venkitaraman, A., Behrmann, L.A., and A.H. Noordermeer. "Perforating Requirements for Sand Prevention." Paper presented at the SPE International Symposium on Formation Damage Control, Lafayette, Louisiana, February 2000. doi: https://doi.org/10.2118/58788-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu toolbar search search input Search input auto suggest filter your search All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE International Conference and Exhibition on Formation Damage Control Search Advanced Search AbstractSand prevention implies an acceptable risk of sand production over the producing life of the well with no sand control mechanisms implemented. This paper reviews available methods to optimize the choice of perforation parameters (phasing, shot density and charge type) for sand prevention. Prior work has shown that sand production is preceded by failure of the perforation tunnels. In order to have successful sand prevention it is necessary to have stable perforation tunnels through rate (drawdown) changes, depletion, and water-cut. Available methods to determine the ability of perforation tunnels to produce sand free can be classified into theoretical models, experimental methods and historical techniques.Deep penetrating charges are recommended as they produce smaller diameter perforation tunnels that are more stable than larger diameter tunnels produced by big hole charges. Optimum phasing technique relies on the maximization of distance between adjacent perforations in 3-dimensional space for a given wellbore radius and shot density. This is advantageous in avoiding inter-linking of failed zones around adjacent perforations. Data from the Magnus field in the North Sea supports the use of these two techniques in minimizing sand production. Where there are significant stress contrasts in the formation and the directions are known, oriented perforating can be used to increase the stability of perforation tunnels (especially when increasing drawdown and when depleting the reservoir).It is shown how these three main techniques can be used to perforate for sand prevention. In addition, the paper also provides guidelines on how to avoid sand production at the time of perforation, selective perforating where there is a contrast in formation strength with depth and the use of experimental techniques to determine perforation stability due to rate (drawdown) changes, depletion and water-cut.IntroductionIn most unconsolidated and weakly consolidated wells around the world, traditional approach has been to use sand control techniques whenever there was a risk of sand production. This was driven mainly by safety (erosion of surface hardware) and economic concerns. However many wells where sand control mechanisms are installed have proven to be costly in terms of productivity impairment. There has been a two-fold approach to tackling this problem:determine the sources of impairment to sand control methods and find out how to minimize them1, andprudent use of sand prevention techniques as opposed to total sand exclusion.The essence of sand management is the quantification of the risk of sand production that helps decide if/how/when sand exclusion (control) or sand prevention should be implemented. Sand prevention incorporates methods to minimize the amount of sand produced and also methods to minimize the impact of sand produced. The objective of this paper is to outline best perforating practices for minimizing the amount of sand produced over the producing life of cased and perforated wells. Three main events are responsible for sand production: rate or drawdown changes, depletion (effective stress) and water cut.Sand production is a two-part decoupled phenomenon: Sand must be separated from the perforation tunnel (failure), and the flowing fluid must transport the failed sand. Stress, controlled by drawdown and depletion does the first, and rate, also controlled by drawdown does the second2. Using this theory sand production is dictated by the stability of perforation tunnels. Prior to perforating for sand prevention it is necessary to determine whether the tunnels would be stable over the producing life of the well.Perforation Tunnel Stability DeterminationFor successful sand prevention, a good understanding of the stability of the tunnels over the producing life of the well is needed before completion. Three different approaches are used by the industry to accomplish this. Keywords: completion installation and operations, drawdown, requirement, depletion, venkitaraman, perforation, shot density, theoretical model, perforation tunnel, stability Subjects: Perforating, Completion Installation and Operations, Completion Operations This content is only available via PDF. 2000. Society of Petroleum Engineers You can access this article if you purchase or spend a download.