Design, Construction, and Optimization of Big-Bore Gas Wells in a GiantOffshore Field

Byron Michael Clancey, A.S.David Khemakhem, Tom Bene, Michael Schmidt

Proceedings of SPE/IADC Drilling Conference · 2007 · 12 citations · 0 references

Concepts

Abstract

Design, Construction, and Optimisation of Big-Bore Gas Wells in a Giant Offshore Field B. M. Clancey; B. M. Clancey RasGas Co. Ltd. Search for other works by this author on: This Site Google Scholar A. S. D. Khemakhem; A. S. D. Khemakhem RasGas Co. Ltd. Search for other works by this author on: This Site Google Scholar T. F. Bene; T. F. Bene RasGas Co. Ltd. Search for other works by this author on: This Site Google Scholar M. H. Schmidt M. H. Schmidt ExxonMobil Development Co. Search for other works by this author on: This Site Google Scholar Paper presented at the SPE/IADC Drilling Conference, Amsterdam, The Netherlands, February 2007. Paper Number: SPE-105509-MS https://doi.org/10.2118/105509-MS Published: February 20 2007 Connected Content Related to: Optimization of Big-Bore Wells in a Giant Offshore Field Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Clancey, B. M., Khemakhem, A. S. D., Bene, T. F., and M. H. Schmidt. "Design, Construction, and Optimisation of Big-Bore Gas Wells in a Giant Offshore Field." Paper presented at the SPE/IADC Drilling Conference, Amsterdam, The Netherlands, February 2007. doi: https://doi.org/10.2118/105509-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu toolbar search search input Search input auto suggest filter your search All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE/IADC Drilling Conference and Exhibition Search Advanced Search Abstract An extensive big bore gas well drilling and completions program is in progress to develop the giant North Field, offshore Qatar. Benefits of the big-bore concept, compared to the prior 7-in. monobore design, include reduced development costs by requiring fewer wells, and deferred installation of compression by providing higher flowing wellhead pressures.This is the widest known application of a big bore design in one single field and involves a large number of wells. Many of these wells are drilled and completed to date and believed to be among the world's most prolific gas producers. These are also the first offshore wells to incorporate big bore well design for large-scale field development and feature industry advances in equipment design and manufacture. An extensive system of detailed design review, equipment performance testing, and quality programs has been implemented to meet challenging project requirements for well reliability.The wells feature a tapered tubing design known as the "Optimized Big Bore" (OBB). This paper discusses the challenges of planning and executing these OBB wells. It reviews the initial OBB well design, anticipated North Field drilling challenges, critical equipment specifications, and design revisions resulting from optimisation efforts over the past four years. Keywords: drilling operation, LNG, liquified natural gas, Upstream Oil & Gas, Completion Installation and Operations, specification, Well Design, liner hanger, requirement, temporary tieback Subjects: Drilling Operations, Natural Gas Conversion and Storage, Liquified natural gas (LNG), Completion Installation and Operations Copyright 2007, SPE/IADC Drilling Conference You can access this article if you purchase or spend a download.