A Dynamic Model for Underbalanced Drilling With Coiled Tubing

Rolv Rommetveit, E.H. Vefring, Zhihua Wang, T. Bieseman, A.M. Faure

Proceedings of SPE/IADC Drilling Conference · 1995 · 10 citations · 0 references

Concepts

Abstract

A Dynamic Model for Underbalanced Drilling With Coiled Tubing Rolv Rommetveit; Rolv Rommetveit Shell Research B.V. Search for other works by this author on: This Site Google Scholar E.H. Vefring; E.H. Vefring Shell Research B.V. Search for other works by this author on: This Site Google Scholar Zhihua Wang; Zhihua Wang Shell Research B.V. Search for other works by this author on: This Site Google Scholar Research RF-Rogaland; Research RF-Rogaland Shell Research B.V. Search for other works by this author on: This Site Google Scholar Taco Bieseman; Taco Bieseman Shell Research B.V. Search for other works by this author on: This Site Google Scholar A.M. Faure A.M. Faure Shell Research B.V. Search for other works by this author on: This Site Google Scholar Paper presented at the SPE/IADC Drilling Conference, Amsterdam, Netherlands, February 1995. Paper Number: SPE-29363-MS https://doi.org/10.2118/29363-MS Published: February 28 1995 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Rommetveit, Rolv, Vefring, E.H., Wang, Zhihua, RF-Rogaland, Research, Bieseman, Taco, and A.M. Faure. "A Dynamic Model for Underbalanced Drilling With Coiled Tubing." Paper presented at the SPE/IADC Drilling Conference, Amsterdam, Netherlands, February 1995. doi: https://doi.org/10.2118/29363-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE/IADC Drilling Conference and Exhibition Search Advanced Search AbstractA model for underbalanced drilling with coiled tubing has been developed which takes into account all important factors contributing to the process. This model is a unique tool to plan and execute underbalanced or near balance drilling operations. It is a transient, one-dimensional multi-phase flow model with the following components: Lift gas system model, multiphase hydraulics model, reservoir-wellbore interaction model, drilling model, models for multiphase fluids (lift gas, produced gas, mud, foam, produced gas, oil, water and cuttings). Various alternative geometries for gas injection are modelled as well as all important operations during underbalanced drilling with coiled tubing.The model as well as some simulation results from its use are presented in this paper.IntroductionUnderbalanced drilling has been utilised increasingly during the past several years from the perspectives of economics and practical operations. Among the economic benefits, the most important aspect of underbalanced drilling is the prevention of formation damage and hence increasing well productivity. With respect to practical operations, underbalanced drilling is an effective technique for preventing severe lost circulation and differential pipe sticking during drilling.There are several mechanisms that can cause formation damage or permeability impairment during drilling and completions. With a proper selection of drilling or completion fluid system, the most important factor causing the formation damage is the invasion of solids into the formation. This, in turn, is mainly caused by the pressure overbalance towards the formation during drilling or completion operations.Formation damage is a particular concern when drilling horizontal wells or drainhole laterals since horizontal wellbores have a substantially longer exposure time to the fluids (both drilling and completion) compared with the vertical wells and they have reduced clean up velocity. Consequently, underbalanced drilling is often associated with horizontal wells and laterals.Severe lost circulation can be caused by conventional overbalanced drilling, especially in fractured reservoirs. For example, typical horizontal wells drilled overbalanced in Fahud field (fractured carbonate) may take 25,000 m3 of water and 25 m3 cuttings at the start of the horizontal section. As a result, it can cause a delayed peak oil production due to the production back of drilling water (2-6 months), the restricted production rate per well and the reduced ultimate oil production due to formation damage. For these reasons, trials of underbalanced drilling with foam have been conducted with conventional rigs.To achieve the ultimate objective of an underbalanced operation, two important aspects should be noted. One is the personnel and well safety and the other is to maintain the underbalanced condition at all times, especially in horizontal wells.P. 29 Keywords: simulation, mass fraction, gas injection rate, conservation, gor reservoir, artificial lift system, upstream oil & gas, choke, fraction, reservoir Subjects: Drilling Operations, Pressure Management, Drilling Fluids and Materials, Artificial Lift Systems, Underbalanced drilling, Drilling fluid management & disposal, Gas lift This content is only available via PDF. 1995. SPE/IADC Drilling Conference You can access this article if you purchase or spend a download.