Proceedings of SPE Asia Pacific Oil and Gas Conference · 1994 · 53 citations · 0 references
EngineeringGeological EngineeringPetroleum EngineeringHydraulic FracturingReservoir EngineeringWell TestingDrilling HydraulicsDrilling OperationsFracture InitiationNear-wellbore EffectsPerforation DesignWellbore HydraulicsFracture Initiation CriteriaFracture Initiation CriterionNear-wellbore Fracture InitiationPerforatingProppant PlacementWellbore Friction LossWellbore Friction PressureWellbore Perforation Design
Elimination of Near-Wellbore Tortuosities by Means of Hydrojetting J.B. Surjaatmadja; J.B. Surjaatmadja Search for other works by this author on: This Site Google Scholar H.H. Abass; H.H. Abass Search for other works by this author on: This Site Google Scholar J.L. Brumley J.L. Brumley Search for other works by this author on: This Site Google Scholar Paper presented at the SPE Asia Pacific Oil and Gas Conference, Melbourne, Australia, November 1994. Paper Number: SPE-28761-MS https://doi.org/10.2118/28761-MS Published: November 07 1994 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Surjaatmadja, J.B., Abass, H.H., and J.L. Brumley. "Elimination of Near-Wellbore Tortuosities by Means of Hydrojetting." Paper presented at the SPE Asia Pacific Oil and Gas Conference, Melbourne, Australia, November 1994. doi: https://doi.org/10.2118/28761-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Asia Pacific Oil and Gas Conference and Exhibition Search Advanced Search SPE MembersAbstractNear-wellbore tortuosity is one of many conditions that can cause additional friction pressure loss during the injection or production phase of a well. Production pressure loss reduces the potential production capacity of the well. In addition, difficulties with proppant placement are often attributed to the presence of tortuous fracture paths, which can lead to premature screenouts in the fracturing operation.This paper discusses the importance of proper design and placement of perforations to obtain good fracture initiation. By doing so, optimal well production can be attained. Practical implementations of hydrojetting techniques as a substitute for the shaped-charge perforating process are discussed. The formation of tortuosities and the use of hydrojetting are demonstrated through laboratory tests. Hydrojetting tools that are used to achieve a fracture initiation from deviated or horizontal wells are also discussed.IntroductionNear-wellbore stresses, direction of the wellbore, and perforation placement determine the tortuosity of a fracture that initiates from the wellbore. When the well is drilled vertical or perpendicular to the least principal stress, the effects of tortuosities are minimized; however, it is not always appropriate to drill in such directions.In cased-hole completions, shaped-charge perforated holes often create excessive localized stresses and can also slightly crush the cement bond around the perforations. In a fracturing process, these two conditions cause fractures to initiate at locations away from the perforations, thus creating a tortuous path near the wellbore behind the casing wall. In addition, shaped-charge perforated holes are known to have reduced the permeability of the compacted zone around them.Hydrojetting (high-pressure water cutting) can be considered an alternative for perforating cased holes. Hydrojetting does not create localized stresses; therefore, fracture initiation can be easily controlled. Specialized jetting tools are required to provide the desired cavity in the formation.P. 193^ Keywords: principal stress, hydraulic fracturing, tortuosity, surjaatmadja, elimination, upstream oil & gas, near-wellbore tortuosity, abass, completion installation and operations, fracture initiation Subjects: Hydraulic Fracturing, Perforating, Completion Installation and Operations, Completion Operations This content is only available via PDF. 1994. Society of Petroleum Engineers You can access this article if you purchase or spend a download.