Virgo status

117

Citations

1

References

2008

Year

Abstract

The Virgo collaboration has just concluded its first long science run (VSR1). In these four months the detector achieved a good duty cycle, larger than 80%, and an average horizon distance for binary neutron star system sources of about 4 Mpc. An intense commissioning activity was resumed after the run was complete to further increase the performances of the detector and to prepare the Virgo+ upgrades. The detector performances during the first science run and the last commissioning achievements are briefly discussed here.