Proceedings of IADC/SPE Asia Pacific Drilling Technology · 2002 · 12 citations · 0 references
EngineeringOperations ManagementReservoir EngineeringReservoir OperationsSand ControlSand Control Completion DesignWell CompletionWell Completion DesignWell ControlWell PlanningWellbore HydraulicsCompletion Interval DesignIntelligent CompletionsPressure Control ValvesSand Control CompletionSand Control MonitoringSmart CompletionsSmart Well CompletionsWellbore Design
Implementation of Intelligent Well Completions Within a Sand Control Environment W.R. Moore; W.R. Moore WellDynamics International, Ltd. Search for other works by this author on: This Site Google Scholar M.R. Konopczynski; M.R. Konopczynski WellDynamics International, Ltd. Search for other works by this author on: This Site Google Scholar V. Jackson Nielsen V. Jackson Nielsen WellDynamics, Inc. Search for other works by this author on: This Site Google Scholar Paper presented at the IADC/SPE Asia Pacific Drilling Technology, Jakarta, Indonesia, September 2002. Paper Number: SPE-77202-MS https://doi.org/10.2118/77202-MS Published: September 09 2002 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Moore, W.R., Konopczynski, M.R., and V. Jackson Nielsen. "Implementation of Intelligent Well Completions Within a Sand Control Environment." Paper presented at the IADC/SPE Asia Pacific Drilling Technology, Jakarta, Indonesia, September 2002. doi: https://doi.org/10.2118/77202-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)IADC/SPE Asia Pacific Drilling Technology Conference and Exhibition Search Advanced Search AbstractIntelligent well completions have introduced a step-change technology that improves project economics by permitting the operator to actively manage the reservoir.This aspect of asset management is especially important in those wells requiring sand control, often located in remote geographic locations or extreme operating environments, such as deepwater and ultra-deepwater, where the reserves base is high and the subsurface complex. Combining sand control technology with intelligent well technology can be a significant challenge, particularly when producing fluids from multiple, unconsolidated, high productivity zones.To-date, the successful intelligent well completions that have been completed with sand control have been limited to a maximum of two productive intervals with full time monitoring and control. The limitation has been a result of the architecture of a gravel packed completion, requiring that the interval control valves (ICVs) and pressure and temperature gauges be placed above the zones of interest. While valuable to the asset where employed, some operators have expressed a need to have the control and monitoring equipment placed at or in the completion itself, or to have the capability of adding additional sand control completions to the wellbore.Design solutions exist that may permit the operator to stack three or more gravel packs in a single wellbore and achieve full intelligent completion functionality. This paper will discuss those solutions and present several examples and case histories.IntroductionAs intelligent completion technology matures, the field of application continues to expand to increasingly challenging environments such as the poorly consolidated, high permeability, high productivity, clastic reservoirs common to the Gulf of Mexico, offshore West Africa, Australia and the Asia Pacific region, offshore Brazil and the North Sea. These areas fit the modus operandi of intelligent well applications - high productivity wells, complex reservoirs, high capital investment and high intervention costs.1,2,3The challenge of applying downhole flow control to these areas is their propensity to produce significant amounts of formation solids. At the best of times, sand production is not good for conventional completion equipment as the induced damage may potentially lead to safety, environmental and financial consequences. 4 Intelligent completion equipment is faced with similar challenges. Although the condition of the intelligent completion equipment may degrade to a state no worse than its conventional counterpart, its ability to do its job may be compromised. Erosion of choke elements, seal surfaces, control lines, and interference with device movement can render the intelligent completion inoperable, thus losing its functionality and the ability of the operator to use the equipment to realize long term value.Sand control techniques have been applied in these environments with varying degrees of success; however, a properly conceived and executed sand control strategy can be very effective in reducing or eliminating solid production without unduly restricting productivity. New techniques, such as expandable screens, have been added to conventional techniques such as gravel packs and frac packs. But combining sand control technology with intelligent well technology can be a significant challenge, particularly when producing fluid from multiple, unconsolidated, high productivity zones. The intelligent completion industry is attacking this challenge in concert with the sand control industry to generate innovative integrated solutions that bring maximum value to the customer. Keywords: gravel pack, implementation, operator, sand control, intelligent well completion, iadc spe 77202, konopczynski, reservoir, productivity, intelligent well technology Subjects: Screen selection, Sand Control, Completion Operations This content is only available via PDF. 2002. IADC/SPE Asia Pacific Drilling Technology You can access this article if you purchase or spend a download.