2003 · 19 citations · 0 references
EngineeringPetroleum EngineeringDrillingDrilling EngineeringReservoir EngineeringDrilling OperationsExtended-reach DrillingHorizontal DrillingHorizontal Well CompletionsWell CompletionWell PlanningCompletion StrategiesExtended-reach Well PlanningReservoir Contact ManagementReservoir Contact OptimizationWell Productivity Assessment
Challenges and Achievements of Drilling Maximum Reservoir Contact (MRC) Wells in Shaybah Field A.S. Dossary; A.S. Dossary Saudi Aramco Search for other works by this author on: This Site Google Scholar A.A. Mahgoub A.A. Mahgoub Schlumberger Search for other works by this author on: This Site Google Scholar Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, Abu Dhabi, United Arab Emirates, October 2003. Paper Number: SPE-85307-MS https://doi.org/10.2118/85307-MS Published: October 20 2003 Connected Content Related to: Drilling Maximum-Reservoir-Contact Wells in the Shaybah Field Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Dossary, A.S., and A.A. Mahgoub. "Challenges and Achievements of Drilling Maximum Reservoir Contact (MRC) Wells in Shaybah Field." Paper presented at the SPE/IADC Middle East Drilling Technology Conference and Exhibition, Abu Dhabi, United Arab Emirates, October 2003. doi: https://doi.org/10.2118/85307-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu toolbar search search input Search input auto suggest filter your search All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE/IADC Middle East Drilling Technology Conference and Exhibition Search Advanced Search AbstractSaudi Aramco's drilling strategy witnessed a change in year 2002 from drilling horizontal wells to more challenging and extended reach maximum reservoir contact (MRC) wells in Shaybah field. The objectives behind this change were to achieve the following: Improve the well productivity by providing maximum reservoir contact, reduce the unit cost of drilling ($/ft) and production ($/bbl), and to utilize the limited space more efficiently in the Sabkhah (flat areas between huge sand dunes). Different types of MRC wells were drilled, such as fork and fishbone in both open hole and cased hole to allow installing of intelligent completion packers for controlling the rate of production from each lateral. The reason for drilling different types of wells is to evaluate the impact of a well's type on the performance of the reservoir. The longest reservoir exposure ever drilled in Saudi Aramco was achieved by combining between the fork and fishbone in one well reaching up to 12.3 km (7.6 miles). Up to April 2003, eight MRC wells of different types and with 67.4 km (41.9 miles) of reservoir exposure were drilled in Shaybah field.IntroductionField HistoryThe Shaybah field, discovered in 1968, in the Rub'al-Khali desert of Saudi Arabia, is approximately 13 km (8 miles) wide and 64 km (40 miles) long. The surface terrain is comprised of salt flat areas known as sabkhah and mountainous sand dunes (up to 200 meters high). Because of its rugged character, the field is developed from flat sabkhas necessitating highly accurate directional drilling to reach the targets.The oil in the Shu'aiba formation is Arabian Extra Light with an average API of 42° and a solution GOR (Gas-Oil-Ratio) of 750 SCF/STB.It was developed in the mid 1990s using one-km horizontal wells (single-lateral) targeting the Shu'aiba reservoir. The presence of a large overlying gas cap and a relatively weak aquifer dictated the use of horizontal completion to minimize the potential for early gas breakthrough while achieving economically-desirable production rates. The field went into production in July 19981.DefinitionMRC wells are defined as having an aggregate reservoir contact in excess of 5 km through a single or multi-lateral configuration1Objectives:The year 2002 represented a quantum leap for Saudi Aramco's drilling strategy in the Shaybah field. MRC wells were required in areas with low permeability in order to minimize the drawdown and to maximize the sweep efficiency. This drastic change extended to both well types and reservoir contact extent. Employing the available technology and preparing the wells to accommodate future development in the oil industry were taken into consideration. The major objectives of this strategy are to achieve the following:Improve the well productivity by providing maximum reservoir contact.Reduce the number of wells and the surface facilities to put these wells in production.Reduce the unit cost of drilling ($/ft) and production ($/bbl).Utilize the limited space in the Sabkhah more efficiently.Field History:The Shaybah field, discovered in 1968, in the Rub'al-Khali desert of Saudi Arabia, is approximately 13 km (8 miles) wide and 64 km (40 miles) long. The surface terrain is comprised of salt flat areas known as sabkhah and mountainous sand dunes (up to 200 meters high). Because of its rugged character, the field is developed from flat sabkhas necessitating highly accurate directional drilling to reach the targets.The oil in the Shu'aiba formation is Arabian Extra Light with an average API of 42° and a solution GOR (Gas-Oil-Ratio) of 750 SCF/STB.It was developed in the mid 1990s using one-km horizontal wells (single-lateral) targeting the Shu'aiba reservoir. The presence of a large overlying gas cap and a relatively weak aquifer dictated the use of horizontal completion to minimize the potential for early gas breakthrough while achieving economically-desirable production rates. The field went into production in July 19981. Keywords: fishbone, shaybah field, reservoir, tendency, type sidetracked, upstream oil & gas, drilling operation, mrc well, inclination, assembly Subjects: Drilling Operations, Directional drilling This content is only available via PDF. 2003. SPE/IADC Middle East Drilling Technology Conference & Exhibition You can access this article if you purchase or spend a download.