International Journal of Production Research · 2002 · 13 citations · 2 references
EngineeringIndustrial EngineeringManufacturing EngineeringManufacturing SystemsProduction SystemsSchedulingFlexible Manufacturing SchedulingFlexible Manufacturing SystemsProduction ConstraintsProduction SchedulingSchedule OptimizationScheduling TheoryAgent SchedulingFlexible ManufacturingFlexible Production SystemsManufacturing Resource SchedulingMulti-agent SchedulingMulti-resource Scheduling
The object in a flexible manufacturing system is optimal system resources scheduling. The production scheduling of such a system may be resolved by a set of individual agents, who can work in parallel and their coordination may bring a more effective way of finding an optimal solution. The criteria for the optimal solution may be created on a time or economical (cost) basis but each may have a different priority depending on each situation. In this paper, we will analyse an approach to find a feasible schedule of all products, which could minimize costs and satisfy all constraints related to each product.
2