Feasibility of a DC network for commercial facilities

A. Sannino, G. Postiglione, M.H.J. Bollen

Conference Record of the 2002 IEEE Industry Applications Conference. 37th IAS Annual Meeting (Cat. No.02CH37344) · 2003 · 60 citations · 5 references

Concepts

TL;DR

The study evaluates the feasibility of supplying offices and commercial facilities with direct current. The authors analyze a DC case study at Chalmers University and design a battery‑based backup system for reliable power. Voltage‑drop calculations and an economic comparison of AC versus DC, along with brief protection considerations, demonstrate the viability of the DC system.

Abstract

This paper analyzes the feasibility of direct current for the supply of offices and commercial facilities. This is done by analyzing a case study, i.e. the supply to the Department of Electric Power Engineering, Chalmers University of Technology, Gothenburg, Sweden. Voltage drop calculations have been carried out for different voltage levels. A backup system for reliable power supply is designed based on commercially available batteries. Finally, an economic evaluation of AC versus DC is performed and protection of the proposed system is briefly addressed.

References

5