2017 Winter Simulation Conference (WSC) · 2017 · 27 citations · 7 references
EngineeringIndustrial EngineeringManufacturing EngineeringComputer-integrated ManufacturingManufacturing SystemsSchedulingDynamic SchedulingFlexible Manufacturing SystemsManufacturing AutomationManufacturing Execution SystemsManufacturing SimulationShop Floor ControlFactory SimulationFlexible ManufacturingFlexible Manufacturing System SimulationManufacturing System SimulationProduction System SimulationScheduling SimulationShop Floor SimulationSimulation Of Manufacturing Systems
The Industry 4.0 environment enables direct communication between the manufacturer's shop floor and a customer. Thus, the manufacturer is able to respond to the customers' requests more quickly, meaning that manufacturers must now more tightly control the shop floor planning and scheduling. Here we present a simulation-based scheduling model for Flexible Manufacturing System dynamic shop-floor control. The customer's order and the processing sequence table of the products are imported into the simulation model. Experiments are implemented for the case wherein the system encounters unexpected conditions. The proposed approach represents a potential tool for manufacturers to make decisions in the real time by further connecting to the Enterprise Resource Planning and Manufacturing Execution System.
7