The Engineering Approach to Sand Production Prediction

Ken W. Weissenburger, Nobuo Morita, Alicia Martín, Donald L. Whitfill

Proceedings of SPE Annual Technical Conference and Exhibition · 1987 · 17 citations · 0 references

Concepts

Abstract

The Engineering Approach to Sand Production Prediction K.W. Weissenburger; K.W. Weissenburger Conoco Production R and D Search for other works by this author on: This Site Google Scholar N. Morita; N. Morita Conoco Production R and D Search for other works by this author on: This Site Google Scholar A.J. Martin; A.J. Martin Conoco Production Engineering Services Search for other works by this author on: This Site Google Scholar D.L. Whitfill D.L. Whitfill Conoco Production R and D Search for other works by this author on: This Site Google Scholar Paper presented at the SPE Annual Technical Conference and Exhibition, Dallas, Texas, September 1987. Paper Number: SPE-16892-MS https://doi.org/10.2118/16892-MS Published: September 27 1987 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Weissenburger, K.W., Morita, N., Martin, A.J., and D.L. Whitfill. "The Engineering Approach to Sand Production Prediction." Paper presented at the SPE Annual Technical Conference and Exhibition, Dallas, Texas, September 1987. doi: https://doi.org/10.2118/16892-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu toolbar search search input Search input auto suggest filter your search All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Annual Technical Conference and Exhibition Search Advanced Search SPE MembersAbstractAn engineering system has been developed for sand production prediction. The system synergistically uses geological reservoir characterization, log analysis, and core rock strength testing to forecast perforation cavity stability. Coupling the system with a reservoir simulator permits the modeling of cavity stability at initial conditions and throughout the life of a well. Three examples are given of applications of the engineering system to sand problems in North Sea reservoirs.IntroductionSand production prediction refers to the forecasting of perforation cavity stability in natural completions (i.e., perforated casing). When anticipated conditions of fluid flow or pressure drawdown lead to predictions of uncontrolled and potentially catastrophic sand production, alternatives to natural completions must be used (e.g., selective perforations, gravel packs).In many cases in mature producing areas, sand production prediction has come to be based on empirical relationships and historical precedent. In newer areas, especially offshore, completion engineers are challenged by the need to forecast sand production without analogous reservoir performance as a guide. The cost of positive sand control measures and deferred revenue from possibly reduced rates of initial hydrocarbon production provide the economic incentive for improved sand production prediction methodologies and optimized completion planning.For completion planning or analysis of sand problems of several North Sea reservoirs, an engineering system was developed to integrate geological description, log analysis, core testing, and reservoir simulation. This paper gives an overview of the generic engineering system that has evolved and of the types of data needed from exploration and development programs to make the best possible predictions of perforation cavity stability for completion planning.THE ENGINEERING SYSTEMSand Production Causes and ConstraintsSand problems can be induced by various causes and the consequences of sand production can affect various aspects of reservoir management. Because of the many factors affecting sand production, a strategy for optimized field operation requires comprehensive judgments integrating geology, rock mechanics, logging, production technology, and reservoir engineering.The engineering system starts by identifying constraints inherent in the reservoir or in production facilities. Constraints will help define an operator g ability to control sand production through reservoir management. Examples of constraints with possible impacts on sand production would include:High bubble point oil. To maintain high recovery from a high bubble point reservoir, the reservoir pressure and the well pressure should not be lowered below the bubble point.Erosional limits. Tubing and valves installed along the flow line may have erosional limits. To prevent excessive erosion, drawdown may have to be limited in such a well.Limited pressure support. Water injection rates may be limited in some reservoirs.P. 151^ Keywords: application, strength, objective, prediction, cavity stability model, reservoir, society of petroleum engineers, constraint, engineering system, perforation Subjects: Reservoir Characterization, Formation Evaluation & Management, Perforating, Completion Installation and Operations, Completion Operations This content is only available via PDF. 1987. Society of Petroleum Engineers You can access this article if you purchase or spend a download.