Proceedings of SPE Annual Technical Conference and Exhibition · 1994 · 10 citations · 0 references
ManagementConstruction ManagementQuality ManagementQuality AssuranceQuality EngineeringQuality ImprovementCementing OperationsConstruction Quality ManagementEquipment MaintenanceMaterial Quality ControlQuality Control In ConstructionQuality Management SystemsCement PluggingCement Slurry DesignCementingLost CirculationPlug And Abandonment CementingPlug SettingPlugsWellbore Cementing
Quality Management Alliance Eliminates Plug Failures James Heathman; James Heathman Halliburton Energy Services Search for other works by this author on: This Site Google Scholar Robert Carpenter Robert Carpenter Arco Search for other works by this author on: This Site Google Scholar Paper presented at the SPE Annual Technical Conference and Exhibition, New Orleans, Louisiana, September 1994. Paper Number: SPE-28321-MS https://doi.org/10.2118/28321-MS Published: September 25 1994 Cite View This Citation Add to Citation Manager Share Icon Share Twitter LinkedIn Get Permissions Search Site Citation Heathman, James, and Robert Carpenter. "Quality Management Alliance Eliminates Plug Failures." Paper presented at the SPE Annual Technical Conference and Exhibition, New Orleans, Louisiana, September 1994. doi: https://doi.org/10.2118/28321-MS Download citation file: Ris (Zotero) Reference Manager EasyBib Bookends Mendeley Papers EndNote RefWorks BibTex Search Dropdown Menu nav search search input Search input auto suggest search filter All ContentAll ProceedingsSociety of Petroleum Engineers (SPE)SPE Annual Technical Conference and Exhibition Search Advanced Search AbstractPlug cementing is a very broad term that may include setting cement plugs for abandonment, sidetracking a wellbore, lost-circulation control, or remedial work. There arc several means by which this may be accomplished, including the balanced plug and dump bailer methods. Unfortunately, plug cementing is a process that often receives simplistic treatment. However, even plug cementing is by no means simplistic and can be very costly if not properly executed. In addition to the immediate rig time and materials cost associated with a poor cement plug, there are also potential costs from well control and environmental problems.This paper describes the activities and results of an operator/service company quality alliance. The immediate project goal was to improve the success rate of cement sidetrack plugs in the US Gulf Coast operating area. All aspects of the cementing process, including slurry design, material and job quality control, and displacement practices were systematically evaluated and modified as necessary. During the latter stages of the project, a recommended plug procedure (RPP) was established that addressed many of the shortcomings of past practices. A continuous job evaluation process or "Quality Management System" was also implemented to ensure continuous monitoring and refinement of the RPP.Before this procedure was implemented, the prevailing standard in the Gulf Coast was approximately two to five attempts to achieve a successful sidetrack plug. The industry average was approximately 2.4 attempts per kickoff. As of this writing, proper use of the RPP outlined by the study group has achieved a near 100% success rate. Although originally targeted for the Gulf Coast operating area, the RPP has proven to be a global success. This program has provided a multi-million dollar cost reduction to the operating companies using it, and illustrates the value of properly structured operator/service company technology alliances.BackgroundWhen viewed from a macroscopic perspective, the cementing practices followed in the Gulf Coast use the latest technology and are viewed as highly successful. However, upon closer examination, the operator found that certain chronic problems existed that, when combined, represented a large annual expense.P. 297^ Keywords: tailpipe, casing and cementing, cement slurry, operator, wellbore, contamination, drilling fluid formulation, rpp, slurry, drilling operation Subjects: Drilling Operations, Drilling Fluids and Materials, Casing and Cementing, Drilling fluid selection and formulation (chemistry, properties) This content is only available via PDF. 1994. Society of Petroleum Engineers You can access this article if you purchase or spend a download.