ON N-JOB, 2-MACHINE FLOW-SHOP SCHEDULING PROBLEM WITH ARBITRARY TIME LAGS AND TRANSPORTATION TIMES OF JOBS

Parkash Lal Maggu, Manohar Lal Smghal, Noor Mohammad, Sri Krishan Yadav

Journal of the Operations Research Society of Japan · 1982 · 12 citations · 2 references

DOIFull text

Open access

Concepts

Abstract

This short paper gives solution algorithm of obtaining an optimal sequence to give minimum total elapsed time in a 'n-job, 2-machine' flow-shop scheduling problem in which jobs involve Arbitrary Time Lags (i.e. Start Lags and Stop Lags) and Transportation Times. All the times (Processing Times, Arbitrary Lags, and Transportation times) are given prior and are of deterministic nature.

References

2