UNSWorks (University of New South Wales, Sydney, Australia) · 2021 · 16 citations · 0 references
ArchitectureUrban PlanningBuilding MaterialsBuilding StructuresHousingBlock StructureCompact City FormCompact Urban FormCrack AssessmentCrack RepairCompact City DesignCompact City DevelopmentCompact City ModelCompact City TheoryMulti-strata SystemsStructural Crack AnalysisStructural Housing Defects
Context1.As planners and developers have embraced higher density housing development in Australian cities, there have been growing concerns about the quality of multi-unit strata titled (MUST) developments, with building defects the subject of considerable debate in the building professions and the media.Despite multiple reviews and inquiries, it took the emergency evacuation of two apartment complexes in Sydney in 2018/2019 to prompt significant regulatory reform in NSW (see Chapter 2).2. While research has shown defects to be a chronic issue in the house building sector, the issue of apartment quality and defects has received less academic attention (see Chapter 3).The few existing Australian studies indicate a significant incidence of defects in MUST developments, exacerbated by governance, regulatory, legal and financial difficulties for residents.These studies also highlight challenges in collecting accurate data about the prevalence of defects in MUST housing.3. Research in this area is made more complex by a lack of clarity around how 'defects' and 'defective work' are defined and identified (see Chapter 4).This report adopts a definition of a defective building as: a building that is not fit for its purpose due to a failing or shortcoming in the function, performance, statutory or user requirements of the building, where the failing or shortcoming has existed since construction or been triggered later on by faulty original construction or design.However, when interpreting the findings it is important to keep in mind the inconsistencies in defining defects in both theory and practice.4. While empirical evidence regarding defects in MUST developments is limited, research shows that the MUST development model entails many factors that can generate poor quality outcomes.Principal amongst these is the lack of consumer input in the outcomes (see section 3.2).Whereas in other construction contexts, such as a commercial building, the client has oversight as the project proceeds, in the MUST sector, individual purchasers have little involvement until after completion.This means only public agencies provide independent oversight of these developments.If these agencies are not closely enforcing quality standards, developers are incentivised to complete quickly and cheaply (often resulting in lower quality), contrary to the purchasers' interest in receiving a high-quality building ('split incentives').This market model also gives rise to 'information asymmetries', where one party is better informed than the other -in this case, developers are more informed about building quality than buyers.Buyers are not well-placed to identify poor quality work, distorting the market and undermining its performance.7. Stage 2 involved interviews with 66 practitioners and stakeholders involved in strata development, management and defect rectification.Participants included engineers, certifiers, rectification experts, government officials, academics, strata managers and inspectors, builders, subcontractors, developers, construction industry peak bodies, insurers, architects, building designers and lawyers.The aim was to ensure a diverse mix of perspectives and a comprehensive picture of the extent of the problem, what causes defects and how they can be prevented. Availability of quantitative data8. Chapter 6 presents and discusses our data.Stage 1 produced over 2000 pieces of data relevant to our sample.We anticipated encountering obstacles in collating material about defects, but the situation was worse than anticipated.Information on building defects is scarce and spread widely.Bodies that hold potentially relevant information include local and state government departments, private certifiers, contractors and subcontractors, builders, developers, rectification firms, strata managers, owners corporations (OCs), tribunals and courts, law firms, strata inspectors, construction and strata insurers and real estate agents.Building a comprehensive database of existing defects requires liaising with each party individually and dealing with complex confidentiality issues, which often prevent data access.9.Even when data is available, it is often inconsistent in both content and format.For example, there were notable variations for both strata inspection reports and defects reports, not just in style, content and intended audience, but also in how key information was classified, with similar defects categorised differently by different providers.This made comparisons difficult.10. Data robustness is also a concern.While defects reports were our most comprehensive source of data, their robustness depends on the skill of the consultant, and whether destructive testing is possible.Some serious defects (including leaks, fire protection system flaws and electrical wiring faults) may not be visible, meaning a defects report based only on a visual inspection is necessarily incomplete.Robustness is also an issue in strata inspection reports, due to the quality of record-keeping by OCs and strata managers, and the skills of strata inspectors.We found significant variation in format and comprehensiveness; 12% of reports reviewed did not consider the issue of defects at all. Prevalence and severity of defects11.Our data indicates defects are common.We have evidence of at least one defect for 26% of the schemes in our dataset, however due to scarce data this is likely to be a poor estimate of true defect prevalencewe cannot tell how much the numbers reflect (lack of) reporting.To better ascertain prevalence, we can restrict analysis to those schemes for which we have what we consider 'more robust' data (314 schemes).Of schemes with more robust data, 51% have evidence of at least one defect, and 12% have evidence of at least ten types of defects (see section 6.3).12. The most prevalent types of defects in our dataset reflect past findings, especially regarding the 'big three' of water, cracking and fire safety issues (estimated at 42%, 26% and 17% respectively for our 'more robust data' schemes).The prevalence of water-related defects is concerning considering that past research shows these are amongst the most expensive to fix.Some cracks may be only cosmetic, but others affect structural integrity.Fire issues were less prevalent than expected (based on previous research), which may be due to different categorisation in documents (e.g. as door defects).This may also be because fire defects tend to remain hidden until there is destructive investigation or unrelated rectification work.Notably, these findings largely reflect early occupation certificate audit data from the NSW Office of the Building Commissioner (OBC), whose analysis showed issues with waterproofing (53%), structural concerns (44%) and fire safety (45%) in buildings reviewed under the new inspection scheme.13. Regarding defect severity, we can turn to NSW case law and Home Building Compensation Fund (HBCF) claims datasets.In the case law dataset, the median of costs estimates and ordered payouts is $500,000, with the largest figure mentioned $14.3 million.The HBCF dataset covers all NSW multi-unit buildings of iii three or fewer storeys with builders insurance policies taken out between 2010 and 2020.For almost one in fifty policies (1.8%), the builder has disappeared/become insolvent, work is incomplete/defective, and icare has estimated the rectification cost at more than $10,000 per unit.In four cases, rectification is estimated to cost more than the original contract value, and in 1.4% of all schemes the figure is at least 10% of the contract value.Evidently, large sums are being spent to litigate and rectify building defects in MUST developments in NSW by owners, contractors and insurers.While we cannot be sure of the ratio between cosmetic and more significant defects, our data refutes the argument that major/concerning defects are rare and the defects 'crisis' is simply an exaggeration of cosmetic issues.14.The views of our expert interviewees aligned with the findings from our Stage 1 data analysis (see section 6.4).Only three of 66 interviewees felt defects in the MUST sector were not a large or growing problem in NSW.Those who disagreed suggested that defect prevalence was on par with international rates, and any perceived increases were due to increased apartment supply, with defect rates constant.On the other hand, many other experts felt the scale and severity of the problem was not widely appreciated.Information breakdowns, lack of transparency, and their effects 15.Information asymmetries and lack of data are frustrating for researchers, but also cause for greater concern.Because of the vulnerability of MUST consumers, information transparency is even more important than in other construction contexts (e.g.commercial buildings).Transparent and accurate information can help mitigate weaknesses in the MUST model, enabling purchasers to exercise their market power more effectively, regulators to regulate more effectively, and third parties (financiers and insurers) to drive quality outcomes by accurately pricing risk.At present, the system is not doing this.The interview data reveals the causes and effects of these information breakdowns, detailed in Chapter 7.16.The interviews highlight information breakdowns at all points in the MUST development and sale process.Of all participants in the MUST development process, development teams should have the clearest visibility of building quality issues.However, our interviews indicated that this is not always the case (section 7.1).Information may be lost because it is not required (or checked) by audit mechanisms, with documentation often the first to fall to pressures for speed and reduced costs.Upfront design and documentation may be lacking, especially in design and construct (D&C) contracts.Furthermore, tendering with minimum documentation allows (and may incentivise) cost cutting, while leading to gaps in records and mistak