Algorithms · 2021 · 22 citations · 41 references
Natural SciencesIndustrial EngineeringManufacturing EngineeringAlgorithmsOptimizationSchedulingCombinatorial OptimizationFlow Shop SchedulingInteger ProgrammingJob SchedulingMachine SchedulingMetaheuristic OptimizationFlow ShopGreedy HeuristicsHeuristic AlgorithmsMetaheuristic SearchMixed-integer ProgrammingScheduling ProblemsSimulated AnnealingTotal Weighted Tardiness
This study considers a scheduling problem for a flow shop with urgent jobs and limited waiting times. The urgent jobs and limited waiting times are major considerations for scheduling in semiconductor manufacturing systems. The objective function is to minimize a weighted sum of total tardiness of urgent jobs and the makespan of normal jobs. This problem is formulated in mixed integer programming (MIP). By using a commercial optimization solver, the MIP can be used to find an optimal solution. However, because this problem is proved to be NP-hard, solving to optimality requires a significantly long computation time for a practical size problem. Therefore, this study adopts metaheuristic algorithms to obtain a good solution quickly. To complete this, two metaheuristic algorithms (an iterated greedy algorithm and a simulated annealing algorithm) are proposed, and a series of computational experiments were performed to examine the effectiveness and efficiency of the proposed algorithms.
41
Simulated annealing for permutation flow-shop scheduling
IH Osman, CN Potts · Omega · 1989 · 607 citations
Management, Industrial Engineering, Manufacturing Engineering +10
Scheduling Problems with Two Competing Agents
Alessandro Agnetis, Pitu B. Mirchandani, Dario Pacciarelli et al. · Operations Research · 2004 · 462 citations · Full text