OSTI OAI (U.S. Department of Energy Office of Scientific and Technical Information) · 2003 · 68 citations · 0 references
PlanningCybersecurityCritical Infrastructure ProtectionDisaster PreparednessEnergy PolicyCritical Infrastructure RecoveryEnergy SecurityPower Grid AnalysisPower System ReliabilityPower SystemsBlackout EpisodesCyber-physical System SecurityEnergy CrisesGrid Reliability AssessmentNuclear Power StationsOutage ManagementPower System CybersecurityPower System Planning
A U.S.-Canada Power System Outage Task Force was created following a massive power outage on August 14, 2003 which affected approximately 50 million people in the Midwest and Northeast United States and Ontario, Canada. The Task Force divided its work into two phases. The first phase of work was to investigate the outage, and to determine its causes and why it was not contained. The second phase involved recommendations to reduce the possibility of future outages and to minimize the scope of any that may occur. The chapters of this report dealt with the following issues: the North American electric power system and its reliability organizations; status of the Northeastern power grid before the blackout sequence began; how and why the blackout began; the cascade stage of the blackout; the August 14 blackout compared with previous major North American outages; performance of nuclear power plants affected by the blackout; and, physical and cyber security aspects of the blackout. Three public forums will be held in which the public will have the opportunity to comment on the report and present recommendations for consideration by the Task Force. The report indicates that the loss of FirstEnergy's overloaded Sammis-Star line triggered the cascade. Its 345-kV line into northern Ohio from eastern Ohio began tripping out because the lines were in contact with overgrown trees. The loss of the line created major and unsustainable burdens on lines in adjacent areas. The cascade spread rapidly as lines and generating units automatically took themselves out of service to avoid physical damage. The blackout had many contributing factors in common with earlier outages including: inadequate tree trimming, failure to identify emergency conditions, inadequate operator training, and inadequate regional-scale visibility over the power system. Contributing factors to the August 14 blackout included: inadequate inter-regional visibility over the power system; dysfunction of control area SCADA/EMS system; and, a lack of adequate backup capability to that system. It was noted that the nuclear power plants did not trigger the blackout. All nuclear plants shutdown and responded in a manner consistent with plant designs and safety functions. Analysis to date shows no evidence that a malicious cyber event played a role in the power outage. 4 tabs., 47 figs., 4 appendices.