2008 Winter Simulation Conference · 2008 · 19 citations · 18 references
ManagementIndustrial EngineeringOperations ManagementOperations PlanningParallel ComputingSchedulingHealthcare SchedulingJob SequencingMachine SchedulingScheduling TheoryStochastic SchedulingSurgical Resource UtilizationHeuristic AlgorithmsNp-hardnessOperating Room Resource AllocationOperating Room Time UtilizationParallel Machine SchedulingScheduling With Sequence-dependent Setup TimesSequence-dependent Setup TimesSetup Times
This paper addresses a surgery rooms scheduling problem. The problem is modeled as a parallel machine scheduling problem with sequence dependent setup times and an objective of minimizing the makespan. This is a NP-hard problem and in this paper, a solution heuristic is developed and compared to existing ones using simulation. The results and analysis obtained from the computational experiments proved the superiority of the proposed algorithm LEPST over the other algorithms presented.
18
Scheduling: Theory, Algorithms, and Systems
Michael Pinedo · IIE Transactions · 1996 · 6.3K citations
Bounds on Multiprocessing Timing Anomalies
Ron Graham · SIAM Journal on Applied Mathematics · 1969 · 2.4K citations
Aïda Jebali, Atidel B. Hadj-Alouane, P. Ladet · International Journal of Production Economics · 2005 · 366 citations
Alain Guinet, Sondès Chaabane · International Journal of Production Economics · 2003 · 318 citations
On the Complexity of Scheduling with Batch Setup Times
Clyde Monma, Chris N. Potts · Operations Research · 1989 · 292 citations